You can: log in, read the tech support FAQ, or request your lost password. This dumb message (and those ads) will appear on every screen until you register! Get rid of this crap by registering your own SA Forums Account and joining roughly 150,000 Goons, for the one-time price of $9.95! We charge money because it costs us money per month for bills, and since we don't believe in showing ads to our users, we try to make the money back through forum registrations.
 
  • Post
  • Reply
Erwin
Feb 17, 2006

Misogynist posted:

Pricing is typically considered to be vendor-confidential privileged information, and it's rather damaging for vendor relations to share it.

Only because the way storage hardware (and most IT resources) is sold is bullshit.

Adbot
ADBOT LOVES YOU

Rhymenoserous
May 23, 2008

Erwin posted:

Only because the way storage hardware (and most IT resources) is sold is bullshit.

I hate having to actually talk people to get a rough estimate of how much something will cost.

Just... have some retail prices layed out then save the enterprise wrangling for the people who actually call for a quote.

This way I can show how cool I am with a printed savings estimate after "Wrangling with the vendor".

Timdogg
Oct 4, 2003

The internet? Is that thing still around?

Misogynist posted:

Pricing is typically considered to be vendor-confidential privileged information, and it's rather damaging for vendor relations to share it. If you have a budget figure, call them up, and see if they have anything that fits your range.

Yeah, I hate getting sales people all excited because the last thing they ever give me is an actual price. I usually have to go through a sales presentation and end up pissing people off because they were completely out of our price range.

Basically I was looking for a range, like over 50K? 100k? 1 BILLION dollars? I just have no concept how much Compellent is.

evil_bunnY
Apr 2, 2003

Erwin posted:

Only because the way storage hardware (and most IT resources) is sold is bullshit.
All it means is it's going to take me 5 times as long to figure out what poo poo should cost. And what I pay for it will be public record (hello European acquisition procedures) so the whole thing is an exercise in futility anyway.

Hell in Sweden I can look at any public purchase made in the past, and if a supplier still sells that product they *have* to offer me the same deal.

necrobobsledder
Mar 21, 2005
Lay down your soul to the gods rock 'n roll
Nap Ghost

Erwin posted:

I think some of their UI messages are written by high school interns:



"Oh some file or directory stuff is happening. You know, like some things, man."
More likely it's some outsourced developer that doesn't speak / read / write English as a native language. I'll be damned if I could come up with good error messages in Chinese or Romanian.

Vulture Culture
Jul 14, 2003

I was never enjoying it. I only eat it for the nutrients.

Timdogg posted:

Yeah, I hate getting sales people all excited because the last thing they ever give me is an actual price. I usually have to go through a sales presentation and end up pissing people off because they were completely out of our price range.
That's why you give them a budget up front. I used to do this with recruiters all the time and it saved me a lot of heartache.

HalloKitty
Sep 30, 2005

Adjust the bass and let the Alpine blast

Rhymenoserous posted:

I hate having to actually talk people to get a rough estimate of how much something will cost.

Just... have some retail prices layed out then save the enterprise wrangling for the people who actually call for a quote.

This way I can show how cool I am with a printed savings estimate after "Wrangling with the vendor".

Yes, yes, yes. I loving hate that you have to get quotes for something they clearly price up every single goddamn day: just make the price clear.

Mierdaan
Sep 14, 2004

Pillbug

necrobobsledder posted:

More likely it's some outsourced developer that doesn't speak / read / write English as a native language. I'll be damned if I could come up with good error messages in Chinese or Romanian.

Reminds me of the best example of this problem, PHP's unexpected T_PAAMAYIM_NEKUDOTAYIM error. As if there's any other kind of T_PAAMAYIM_NEKUDOTAYIM.

szlevi
Sep 10, 2010

[[ POKE 65535,0 ]]

Timdogg posted:

Yeah, I hate getting sales people all excited because the last thing they ever give me is an actual price. I usually have to go through a sales presentation and end up pissing people off because they were completely out of our price range.

Basically I was looking for a range, like over 50K? 100k? 1 BILLION dollars? I just have no concept how much Compellent is.

I'd say your base config starts around ~$80k, few TBs, two NAS and no fancy stuff included. Add a tray of SSD, magic sauce, live volumes etc and you have just doubled the price. Add 10Gb, more disk, capacity etc... you get the picture.

adorai
Nov 2, 2002

10/27/04 Never forget
Grimey Drawer

Maggot Monster posted:

This is probably the laziest thing I'll ever post but does anyone have a decent "business case" they've used that successfully laid out the pricing for machines, storage, cabling, 10G infrastructure, the full works.
I just went through this process for my company.

I started with a number in mind that I figured was palatable for me to spend, and framed the discussion around our DR site. The hardware was lacking if we were to have a real disaster. What I did was priced out a full refresh of our production site, and we will move our production hardware to the DR site. We got 2 years out of it in production, and will now get another 3 years out of it at our DR site.

Realistically, I know my business environment, and it's very easy to justify purchases when the FDIC suggests that you do so.*

Knowing nothing about your company, I would probably just try to make one of the sites the red headed stepchild, and get a 2 year refresh cycle, moving stuff from site a to site c now, and in two years refreshing site b and moving the gear that is there to site c, repeating this process every 4 years. So site C gets 4 year old gear for 2 years.

*On this note, does anyone have any suggestions on how to explain how VMware HA and clustering works to an IT examiner that clearly doesn't understand it? Last year one of the examiners told us that when we did DR testing, we had to bring each VM up on each cluster member to prove that the cluster member could run the VM. We decided we were going to ignore his request, but if he comes back I need to have a reasonable response to him, and I really don't even know where to begin with this guy.

fatjoint
Sep 28, 2005
Fatjoint

adorai posted:

I just went through this process for my company.

I started with a number in mind that I figured was palatable for me to spend, and framed the discussion around our DR site. The hardware was lacking if we were to have a real disaster. What I did was priced out a full refresh of our production site, and we will move our production hardware to the DR site. We got 2 years out of it in production, and will now get another 3 years out of it at our DR site.

Realistically, I know my business environment, and it's very easy to justify purchases when the FDIC suggests that you do so.*

Knowing nothing about your company, I would probably just try to make one of the sites the red headed stepchild, and get a 2 year refresh cycle, moving stuff from site a to site c now, and in two years refreshing site b and moving the gear that is there to site c, repeating this process every 4 years. So site C gets 4 year old gear for 2 years.

*On this note, does anyone have any suggestions on how to explain how VMware HA and clustering works to an IT examiner that clearly doesn't understand it? Last year one of the examiners told us that when we did DR testing, we had to bring each VM up on each cluster member to prove that the cluster member could run the VM. We decided we were going to ignore his request, but if he comes back I need to have a reasonable response to him, and I really don't even know where to begin with this guy.

It's not completely unreasonable, just put members of your cluster in HA into maintenance mode in a rolling fasion to show the vms migrating and existing on different nodes.

adorai
Nov 2, 2002

10/27/04 Never forget
Grimey Drawer

fatjoint posted:

It's not completely unreasonable, just put members of your cluster in HA into maintenance mode in a rolling fasion to show the vms migrating and existing on different nodes.
He asked us to prove that each VM can run on each node. I don't think he believes that each node is configured identically and is definately capable of running each VM. Without maintenance moding all but one node and showing that all VMs can run on that one node (not possible, concurrently) I do not know how to satisfy his request.

complex
Sep 16, 2003

adorai posted:

He asked us to prove that each VM can run on each node. I don't think he believes that each node is configured identically and is definately capable of running each VM. Without maintenance moding all but one node and showing that all VMs can run on that one node (not possible, concurrently) I do not know how to satisfy his request.

The way to answer this is with Host Profiles. You know they're configured identically. He needs vSphere to tell him they're configured identically.

evil_bunnY
Apr 2, 2003

Misogynist posted:

That's why you give them a budget up front. I used to do this with recruiters all the time and it saved me a lot of heartache.
This is the thing I don't understand. In the real world, there are things I'm willing to pay extra for (at the cost of compromising somewhere else). Most people know what they need (if they did some sizing, which they should have) better than the sales "engineer" at the other end of the phone.

Erwin
Feb 17, 2006

Misogynist posted:

That's why you give them a budget up front. I used to do this with recruiters all the time and it saved me a lot of heartache.

And when you give them a budget of $100k, that hardware they just sold to another guy for $75k will be shown to you for $95k because they "really sharpened their pencil and got you a great deal."

Maggot Monster
Nov 27, 2003

adorai posted:

Knowing nothing about your company, I would probably just try to make one of the sites the red headed stepchild, and get a 2 year refresh cycle, moving stuff from site a to site c now, and in two years refreshing site b and moving the gear that is there to site c, repeating this process every 4 years. So site C gets 4 year old gear for 2 years.

To be honest I should have probably elaborated. We have about ~250 or so production servers (probably more hidden and squirreled away around the place) scattered across several datacenters. (4, but I'm only focused on 3 right now).

My job is to help bootstrap the automation so that we can actually scale and manage what we already have, as well as aggressively upgrading from RHEL 3/4 to 5/6. As part of this work we've been rebuilding things straight into production.

We have almost no "test" and extremely limited "dev". What I'm actually trying to spec out right now is enough virtualization to realistically build a full test tier for everything we've got. We wouldn't need as many machines (often services are part of a pool of 5-10 servers) so I think I can get away with 150 nodes at between 2-4G of RAM with 32G of disk for each server (plus an unspecified chunk of space required to replicate smaller test sets of data where appropriate).

I have it in my head that the best thing to spec out is enough hypervisors to handle 100 nodes per datacenter, plus about 5TB of storage in each location as well as 10GigE and other associated stuff to get an environment that is completely dedicated to virtualization.

(Our disaster recovery plans, for better or worse, involve moving to having multiple clusters of services, one per datacenter, with loadbalancing between them. We may never even get close but it seems more likely than trying to do a full DR site.)

Vulture Culture
Jul 14, 2003

I was never enjoying it. I only eat it for the nutrients.

Erwin posted:

And when you give them a budget of $100k, that hardware they just sold to another guy for $75k will be shown to you for $95k because they "really sharpened their pencil and got you a great deal."
This certainly explains why I gave a vendor a budget of $1.5m for a recent project and got back a quote at $600k.

Vendor management takes people skills. If you're not able to competently negotiate, you will get taken advantage of, end of story.

Rhymenoserous
May 23, 2008

Misogynist posted:

This certainly explains why I gave a vendor a budget of $1.5m for a recent project and got back a quote at $600k.

Vendor management takes people skills. If you're not able to competently negotiate, you will get taken advantage of, end of story.

I always say my budget is a lot lower than it is and get competing bids so I can get better prices.

FISHMANPET
Mar 3, 2007

Sweet 'N Sour
Can't
Melt
Steel Beams
So I'm reading through Scott Lowe's "Mastering VMware vSphere 5" and I have to ask, does it get any better? I just started the networking chapter, but after 4 chapters of "Launch the vSphere Client if it is not already running, and connect to a vCenter Server instance." I'm getting pretty exhausted of being taught how to bush buttans.

madsushi
Apr 19, 2009

Baller.
#essereFerrari
Here's how you negotiate with vendors: YOU figure out what you need (space, IOPS, HA, future capacity, etc) and YOU figure out your budget, then you take that to the vendor and see if they can meet the need you defined for the price you specified. Don't make this like a Diablo II trade game, where everyone stands around for 30 minutes just repeating "wug" and "i dunno, wuw".

Dilbert As FUCK
Sep 8, 2007

by Cowcaster
Pillbug

FISHMANPET posted:

So I'm reading through Scott Lowe's "Mastering VMware vSphere 5" and I have to ask, does it get any better? I just started the networking chapter, but after 4 chapters of "Launch the vSphere Client if it is not already running, and connect to a vCenter Server instance." I'm getting pretty exhausted of being taught how to bush buttans.

You can always do everything via powerCLI to make it a bit more challenging, but if you did the 4 then 5 will seem dry

Docjowles
Apr 9, 2009

Rhymenoserous posted:

I always say my budget is a lot lower than it is and get competing bids so I can get better prices.

My vendors probably think I am doing this, but in reality I just have a poo poo budget! Don't be afraid to counter offer; I've gotten some insane deals from sales guys who are eager to get in the door for whatever reason.

For example, I'm working on a project to shore up our crappy backup/DR situation. We're not a huge company so there isn't a lot involved in this, but I want it to scale for the future. Asked a vendor for a quote on some VM-aware backup software, he sent me a figure greater than my budget for the entire project. I told him as much and said no thanks. He came back again with a figure with poo poo I didn't want anyway trimmed off and priced less than half the original quote :stare:

Kerpal
Jul 20, 2003

Well that's weird.
Has anyone ever tried actually backing up ESXi? I'm a little late upgrading from ESXi 4.1 to 5.0 U1. VMWare's upgrade guide warns that you cannot rollback to a previous version once upgrading. Googling around people seem to suggest that there is no point to backing up ESXi. I know you can use the vSphere CLI script vicfg-cfgbackup.pl to backup the configuration. Would it then be possible to rollback by reinstalling ESXi 4.1 over 5.0 and using the saved configuration file? Our environment is very simple, a single host with 10 VMs, no vCenter, update manager, or plugins.

FISHMANPET
Mar 3, 2007

Sweet 'N Sour
Can't
Melt
Steel Beams

Corvettefisher posted:

You can always do everything via powerCLI to make it a bit more challenging, but if you did the 4 then 5 will seem dry

It looks like the networking chapter is more crunch, but I just felt like I was reading page after page of babby's first computer hand holding steps. There are even a few times where he says "this process is exactly the same as the previous thing we just did, but I'm going to walk you through it in mind numbing detail again." So I start to glaze over when it's another 2 pages of screenshots of vSphere wizards and tab clicking. Even if he started his step by step stuff with something like "For this task, we'll need to be in the whatever tab," but instead he walks us through getting to that tab a hundred times, and I feel like if I haven't learned how to find that tab by now, maybe I'm just not cut out for computers (or breathing).

Rhymenoserous
May 23, 2008

Kerpal posted:

Has anyone ever tried actually backing up ESXi? I'm a little late upgrading from ESXi 4.1 to 5.0 U1. VMWare's upgrade guide warns that you cannot rollback to a previous version once upgrading. Googling around people seem to suggest that there is no point to backing up ESXi. I know you can use the vSphere CLI script vicfg-cfgbackup.pl to backup the configuration. Would it then be possible to rollback by reinstalling ESXi 4.1 over 5.0 and using the saved configuration file? Our environment is very simple, a single host with 10 VMs, no vCenter, update manager, or plugins.

It takes like 20 minutes to install ESXi and you have the configs you can just import them. Any bare metal restore you do would take longer than just reinstalling and applying the config.

So uh yes, if you want to roll back just install etc.

Allthough you'd probably be better off just doing a fresh install of 5 and re-attaching your VM's from a time wasted standpoint.

Dilbert As FUCK
Sep 8, 2007

by Cowcaster
Pillbug

Rhymenoserous posted:

It takes like 20 minutes to install ESXi and you have the configs you can just import them. Any bare metal restore you do would take longer than just reinstalling and applying the config.

So uh yes, if you want to roll back just install etc.

Allthough you'd probably be better off just doing a fresh install of 5 and re-attaching your VM's from a time wasted standpoint.

This, and if you have host profiles(lucky SOBs) host profiles is a simple click

Rhymenoserous
May 23, 2008
Yeah, were I him I'd just schedule a 4 hour downtime window at some point and just do it. 4 hours is more than enough time to dig through all the permutations of "Well the upgrade didn't work, I'm going to isntall 5, the 5 install didn't work, I'm going to install 4.1." etc.

Honestly I don't forsee any problems unless you are trying to install it on a graphing calculator or something.

Vulture Culture
Jul 14, 2003

I was never enjoying it. I only eat it for the nutrients.

Kerpal posted:

Has anyone ever tried actually backing up ESXi? I'm a little late upgrading from ESXi 4.1 to 5.0 U1. VMWare's upgrade guide warns that you cannot rollback to a previous version once upgrading. Googling around people seem to suggest that there is no point to backing up ESXi. I know you can use the vSphere CLI script vicfg-cfgbackup.pl to backup the configuration. Would it then be possible to rollback by reinstalling ESXi 4.1 over 5.0 and using the saved configuration file? Our environment is very simple, a single host with 10 VMs, no vCenter, update manager, or plugins.
Are you on shared storage, or local disk? The ESXi footprint by itself will fit on a USB key, if you want to test the upgrade non-disruptively.

Kerpal
Jul 20, 2003

Well that's weird.
It's all on a local RAID. We have ESXi installed on RAID 1 with VM data stored on a RAID 5. Are you saying I can install ESXi 5.0 on a USB flash drive, boot off that with the host, and then add VMs residing on the local RAID to its inventory? That would be a great way to test it.

Nitr0
Aug 17, 2005

IT'S FREE REAL ESTATE

Kerpal posted:

It's all on a local RAID. We have ESXi installed on RAID 1 with VM data stored on a RAID 5. Are you saying I can install ESXi 5.0 on a USB flash drive, boot off that with the host, and then add VMs residing on the local RAID to its inventory? That would be a great way to test it.

yes

Dilbert As FUCK
Sep 8, 2007

by Cowcaster
Pillbug

Kerpal posted:

It's all on a local RAID. We have ESXi installed on RAID 1 with VM data stored on a RAID 5. Are you saying I can install ESXi 5.0 on a USB flash drive, boot off that with the host, and then add VMs residing on the local RAID to its inventory? That would be a great way to test it.
http://kb.vmware.com/selfservice/microsites/search.do?language=en_US&cmd=displayKC&externalId=2004784

Kerpal
Jul 20, 2003

Well that's weird.
I was actually just reading that article once Misogynist pointed it out. Thanks dudes!

Bitch Stewie
Dec 17, 2011

Misogynist posted:

That's why you give them a budget up front. I used to do this with recruiters all the time and it saved me a lot of heartache.

I have to ask, why would you give any vendor your budget upfront?

My personal opinion is that if you have $20k to spend on widgets, and you tell a vendor that you have $20k to spend on widgets, they'll come up with a solution that costs $20k.

Personally I prefer to work on the solution with the obvious caveat that you both need to know that the solution is going to come back in the ballpark.

I had to laugh when we had our SAN. List is/was around $58k. Special bid came back at $43k. They sent us an evaluation unit that was supposed to be from an eval pool but they had none so sent a brand new sealed unit.

After three weeks we were told we could have it at $23k "to save the hassle of collecting it".

I wanted to tell them to gently caress off out of general principle, but we smiled sweetly, said yes please and bought it.

madsushi
Apr 19, 2009

Baller.
#essereFerrari

Bitch Stewie posted:

I have to ask, why would you give any vendor your budget upfront?

My personal opinion is that if you have $20k to spend on widgets, and you tell a vendor that you have $20k to spend on widgets, they'll come up with a solution that costs $20k.

What you have just described is how every business interaction should work.

You tell them "I have $20k and I need a 20 lbs of widgets" and they say "OK, here's 20 lbs of widgets" and everyone is happy. Believe it or not, even if a vendor creates a solution that satisfies your needs and fits within your budget, their actual cost is lower than what they charge you. That difference is called "profit", and it's how business works.

While we can argue the fine details over how much profit it's "ethical" to collect, the fact is that they satisfied your need for the price you asked for.

Rhymenoserous
May 23, 2008

Kerpal posted:

It's all on a local RAID. We have ESXi installed on RAID 1 with VM data stored on a RAID 5. Are you saying I can install ESXi 5.0 on a USB flash drive, boot off that with the host, and then add VMs residing on the local RAID to its inventory? That would be a great way to test it.

Most people I know running ESX on a local raid are buying machines with SD card slots now so they can run the hyper visor off one of those.

evil_bunnY
Apr 2, 2003

Rhymenoserous posted:

Most people I know running ESX on a local raid are buying machines with SD card slots now so they can run the hyper visor off one of those.
Not just on local datastores :clint:

Vulture Culture
Jul 14, 2003

I was never enjoying it. I only eat it for the nutrients.

Bitch Stewie posted:

I have to ask, why would you give any vendor your budget upfront?

My personal opinion is that if you have $20k to spend on widgets, and you tell a vendor that you have $20k to spend on widgets, they'll come up with a solution that costs $20k.

Personally I prefer to work on the solution with the obvious caveat that you both need to know that the solution is going to come back in the ballpark.

I had to laugh when we had our SAN. List is/was around $58k. Special bid came back at $43k. They sent us an evaluation unit that was supposed to be from an eval pool but they had none so sent a brand new sealed unit.

After three weeks we were told we could have it at $23k "to save the hassle of collecting it".

I wanted to tell them to gently caress off out of general principle, but we smiled sweetly, said yes please and bought it.
In my (biased) experience, I've found that the "never name a number first" angle tends to come from:
  • People who aren't comfortable negotiating better prices, and are just looking for the best deal up front with a minimum of human interaction
  • People who don't know the value of the product they're asking about so they shift their gaze whenever the budget question comes up
  • People who aren't even sure what they're buying
Vendors can smell #2 like blood in the water. If you've got a lovely predator of a vendor, there's a good chance that playing your cards too close to the chest will make the sharks more likely to give you a lovely price, not less. Generally, we maintain a very close relationship with our vendor contacts. We're very open about our projects and the problems we face, and we're typically able to negotiate very aggressive pricing because we cut the bullshit, we're direct, and we don't play games. If we're apprehensive about a new vendor, we might say something like, "We have a combined budget of $X between this project and this other project." The vendor should be smart enough to smell out the ballpark figure we're after.

From a professional ethics perspective, pricing is generally considered vendor confidential and it's damaging to vendor relations if you disclose the details of your solution to another vendor. However, there's nothing wrong with saying "Vendor X's nearline storage system came in at $420 per TB and we really need you to come up with something in the ballpark for us to consider your solutions."

Bottom line: you need to know what the product is actually worth, and you need to know the type of person you're dealing with on the sales side of things. If you have a suspicion that a vendor's product is going to fall outside of your budget, express that up front. Vendors appreciate when you don't waste their time as much as you appreciate when they don't waste yours.

Vulture Culture fucked around with this message at 22:27 on Apr 12, 2012

Nukelear v.2
Jun 25, 2004
My optional title text

FISHMANPET posted:

So as I read through Masterping vSphere 5 and VMware vSphere Design, I'm mentally planning my departments virtualization build out (and my boss is listening to me on this, so I can't gently caress it up) and I decided to look for 10 Gb Switches.

:swoon: http://www.dell.com/us/enterprise/p/managed-10gigabit-ethernet-switches :swoon:

Looks like Cisco doesn't even have an equivalent, so I'm guessing nobody does yet. And we can get it for only $10k!

If you haven't bought these yet, Dell steered us toward the 8024F for our VM project. The switch is way cheaper than the 10GBase-T switch and Twinax SFP+ Direct connect has lower transceiver latency than cat6/7. If you are just doing a top-of-rack install that is within the 10m distance of twinax I can't think of a good reason to use cat6/7.

Nukelear v.2 fucked around with this message at 15:41 on Apr 13, 2012

FISHMANPET
Mar 3, 2007

Sweet 'N Sour
Can't
Melt
Steel Beams

Nukelear v.2 posted:

If you haven't bought these yet, Dell steered us toward the 8024F for our VM project. The switch is way cheaper than the 10GBase-T switch and Twinax SFP+ Direct connect has lower transceiver latency than cat6/7. If you are just doing a top-of-rack install that is within the 10m distance of twinax I can't think of a good reason to use cat6/7.

Wow, the 8024F is $3400 cheaper than the 8024. I assumed we'd need to buy SFP+ modules for each of those ports, I didn't realize there existed a cable with an SFP+ end. I assume that I can then plug those into an Intel SFP+ NIC.

Though Dell doesn't currently offer an SFP daughter card on the 12G servers. Though it really doesn't matter, I guess none of this is going to happen for at least 2 years :negative:

Adbot
ADBOT LOVES YOU

Nukelear v.2
Jun 25, 2004
My optional title text

FISHMANPET posted:

Wow, the 8024F is $3400 cheaper than the 8024. I assumed we'd need to buy SFP+ modules for each of those ports, I didn't realize there existed a cable with an SFP+ end. I assume that I can then plug those into an Intel SFP+ NIC.

Though Dell doesn't currently offer an SFP daughter card on the 12G servers. Though it really doesn't matter, I guess none of this is going to happen for at least 2 years :negative:

That's not really an issue unless you need the slots for something else. My setup is 12G, R620's with a Broadcom 57810 dual port SFP+ for iscsi and the daughter card is a quad port 1Gig for general network.

Also not an issue because in two years everything will be different.

Edit: Actually look like they do have a daughter card, that actually looks pretty sweet,
Broadcom 57800 2x10Gb DA/SFP+ + 2x1Gb BT Network Daughter Card

Nukelear v.2 fucked around with this message at 16:48 on Apr 13, 2012